submission of as built drawing

The MVWA will reject improperly spatially referenced as-built surveys. All digital as-built utility information in the as-built survey must reference the State Plane Coordinate System, New York Central Zone, NAD 83 2011(horizontal) and NAVD 88 (vertical) utilizing GEOID 12A or GEOID 12B the units must be in feet and be properly projected into its correct spatial location prior to submitting the MVWA.The as-built survey/drawings shall be prepared at the Applicant’s expense.Ĭ.All utility information must be collected, and locations surveyed, regardless of “typical” alignments.Buried features include, but are not limited to: bends, tees, crosses, reducers/increasers, taps, utility crossings.In the event of any discrepancies identified by the MVWA, and at no cost to the MVWA, the Contractor shall verify the location and measurements of any buried utilities. Stake must have depth from top of feature (or utility crossing) to finished grade and feature (or utility crossing) type marked on the stake. If survey measurement is not practical prior to burial, the Contractor must measure and record approximate depth (nearest 6”) to the buried feature or utility crossing and place a stake directly above the feature or utility crossing that can be surveyed. The Contractor is responsible for coordinating with the Surveyor or Engineer during construction and shall ideally provide access to all utilities prior to being buried, allowing accurate horizontal and vertical measurements to be acquired by the Surveyor or Engineer.

submission of as built drawing

All changes requested by the MVWA as a result of their review must be made to both the stamped original set and the digital file. The MVWA will be allowed two (2) weeks for review of the as-builts.Hand drawn measurements or revisions will not be accepted. An exception may be made for the Contractor to measure the depth to buried infrastructure (refer to B.4). All measurements are to be made by (or under the supervision of) the Surveyor or Engineer who will be certifying the project as constructed.

SUBMISSION OF AS BUILT DRAWING PROFESSIONAL

  • The original set of the as-built construction documents must be stamped by a NYS licensed surveyor or a NYS licensed professional engineer.
  • Prior to receiving water service, the Contractor shall deliver to the MVWA CAD files and certified copies of as-built surveys with all required revisions included as the final as-built survey.